When Minneapolis roofs get replaced
| Month | Permits issued |
|---|---|
| 2025-10 | 387 |
| 2025-11 | 205 |
| 2025-12 | 40 |
| 2026-01 | 11 |
| 2026-02 | 38 |
| 2026-03 | 135 |
| 2026-04 | 224 |
| 2026-05 | 211 |
| 2026-06 | 215 |
| 2026-07 | 268 |
| 2026-08 | 291 |
| 2026-09 | 297 |
Takeaways
- Busiest month in the window: 2025-10 (387 permits).
- Slowest month: 2026-01 (11).
- Total 2025-10-01 to 2026-09-30: 2,322.
Method
Residential single-family, two-family and townhouse permits whose description matches our roofing rules, counted by issue month (Central time). Full method.